• 151

    Projects submitted

  • 109

    Published projects

  • 47

    Comments left

  • 66

    Number of votes

  • 52

    days until voting ends

← Back to list

Enterprise Industrial Data Platform for Safety & Utility Performance

  • Project manager on customer side

    Arun Goel

    Syngene International Limited

    AVP Head Digital COE

  • Category

  • Nomination

  • Goals

    Establish a secure, scalable industrial data foundation that connects manufacturing and utility assets, contextualises time-series data, and makes trusted Safety and utility equipment operational information available for decisions. The project aims to reduce manual data collection, enable near-real-time monitoring and exception management, accelerate root-cause analysis, support energy and asset-performance optimisation, and provide reusable data services for analytics and digital applications. It also standardises the OT-to-IT integration pattern so that new equipment, sites and use cases can be onboarded faster without creating isolated point solutions.

  • Timeline

    april, 2025 — april, 2026
  • Project completion year

    2026

  • Project scale

    6000 human-hours
  • Results

    The project creates value in three ways:

    1. Operationally, it reduces dependence on manual readings and enables faster investigation through aligned historical trends.

    2. Financially, it supplies the measurement backbone needed to identify and verify energy and maintenance opportunities.

    3. Strategically, it creates a reusable digital foundation for analytics, machine learning, digital twins and cross-site benchmarking.

    The architecture is designed to scale by reusing connectors, asset templates, calculation logic and dashboard patterns rather than building separate systems for every use case.

  • Project uniqueness

    The project converts fragmented plant data into a governed, reusable industrial data product rather than delivering a single dashboard or equipment-specific solution. A common OT-to-IT architecture securely acquires signals from heterogeneous control systems, preserves source context, applies consistent asset naming and metadata, and exposes curated information to multiple business use cases. The same foundation supports operations visibility, utilities optimisation, condition monitoring, investigations and future advanced analytics. Its distinctive strength is the combination of brownfield connectivity, pharma-grade governance, reusable templates and value-led scale-up, allowing digital use cases to be deployed without repeatedly rebuilding acquisition, security and data-context layers.

  • Software used

    1. Industrial data platform (AVEVA PI System) for Time-series collection, historisation, contextualisation, calculations and visualisation

    2. OPC UA / OPC DA, Modbus TCP, vendor interfaces and secure gateways, as applicable for read-only acquisition from PLCs, SCADA, meters and packaged equipment

    3. PLCs, SCADA/DCS, building and utility systems, energy meters, Safety and equipment sensors for operational, process, condition and energy signals

    4. Virtual servers, storage, backup, network segmentation, firewalls and time synchronisation infrastructure for reliable, secure and supportable enterprise deployment

    5. Web dashboards, trends, notifications and role-based views for visibility, exception management and investigation

    6. Curated datasets and APIs / connectors where approved for energy optimisation, reliability analysis and future advanced analytics

  • Solution from the Global CIO catalog

    The project does not use solutions from the Global CIO catalog

  • Project implementation complexity

    Implementation required integration across brownfield equipment with different vintages, protocols and ownership boundaries while maintaining cyber-security and operational continuity. Signal naming, engineering units, timestamps and quality flags were inconsistent across sources and had to be standardised without disrupting validated control systems. The team also had to separate monitoring from control, design secure data flows across OT and IT zones, coordinate vendors and site teams, and manage access, backup, performance and change control. Value use cases needed reliable baselines and operating-context normalisation, particularly for energy systems affected by load, temperature, schedules and set points. These challenges were addressed through phased onboarding, source-to-platform reconciliation, reusable asset templates, data-quality checks, role-based access and formal operating governance.

  • Description

    Syngene's IIoT programme establishes an enterprise industrial-data layer for manufacturing, laboratories and utility operations. The platform acquires time-series signals from installed automation and metering systems through controlled interfaces, brings them into a central historian, and organises them using standard asset structures, tags, engineering units and metadata. Role-based dashboards and trends give engineering, operations and digital teams a common view of equipment state, process parameters, alarms and energy performance.

    The delivery followed a platform-plus-use-case approach

    1. The team defined the reference architecture, network zones, interface standards, access model and repeatable onboarding method.

    2. Priority assets and signals were connected and validated against source systems.

    3. Contextualised datasets and dashboards were created for operational monitoring and analysis.

    4. Selected value use cases were developed, including utility performance monitoring, Safety Alert dashboards and early alert systems.

    5. Governance processes were established for tag requests, data quality, change control, user access, backup and support.

  • Project geography

    Bengaluru, Karnataka, India

  • Additional presentations

Comment

Only authorized users can comment.
We suggest you or register.

  • Customer

    Syngene International Limited

We use cookies for analytical purposes and to deliver you the best experience with our website. Continuing to the site, you agree to the Cookie Policy.